Under Construction: Lakeridge Springs Irrigation Pipeline

In the Winter of 2016, a damaged irrigation water supply pipe overflowed into a homeowner’s backyard, flooding portions of their property and adjacent street. DEC was contracted to evaluate the condition of the pipe and concluded a portion should be abandoned and an alternative alignment be established. DEC designed a 15-inch pipeline gravity irrigation system to by-pass the damaged section, cross beneath the Steamboat Canal, and restore irrigation supply from Evans Creek to Lake Stanley at Lakeridge Golf Course. Gerhardt & Berry Construction are constructing the pipeline on behalf of the Lakeridge Springs neighborhood.